SUMMARY OF THE TRANSMISSION PERFORMANCE REPORT OF MPPTCL FOR THE YEAR 2004-05  

In Compliance to clause 18.11 of “Conditions of Licence for Transmission Licensee, Regulation 2004”, MP Power Transmission Company Limited has submitted the performance report on the following parameters: 

1.         System Capacity Addition during the Year 2004-05:

             The details of the Capacity addition are given in the table below:

Sl. No.

Voltage (kV)

Capacity Addition in Transmission Lines
(ckt-kM)

Addition in Transformation Capacity (MVA)

As on 31-03-04

During the year
2004-05

As on
31-03-05

As on
31-03-04

During the year
2004-05

As on
31-03-05

1

400 kV

1723

591

2314

2940

315

3255

2

220 kV

6593

287

6880

7250

1280

8530

3

132 kV

9670

385

10055

9207

800

10007

4

66 kV

61

0

61

20

0

0

2.         Demand Met During the Year 2004-05:

            MPPTCL system has met the peak demand of more than 5000 MW twice in the year 2004-05. The chart showing month wise maximum demand met during the year 2004-05 and a comparison with the month wise maximum demand met demand in the year 2003-04 is given below:

3.         Energy Handled During the Year 2004-05:

            The Transmission System of the State has handled the energy to the tune of 29531 MUs in the year 2004-05. For the year 2003-04 the system handled 27554 MUs. The chart giving month wise comparison for the years 2003-04 and 2004-05 is given below:

4.         Transmission Losses:

            There is a reduction of 0.5% in the transmission losses from the year 2003-04 to the year 2004-05. Simultaneously the system has handled about 7% more energy in the year 2004-05 from year 2003-04. The overall losses in the transmission system for the year 2004-05 have been reduced to 5.62% from 6.12% in the year 2003-04. For the year 2005-06, the Company has projected the transmission losses of the order of 5.10%, a further reduction of about 0.5%.

5.         Frequency Excursion:

            During the year 2004-05, the frequency was in range of 49 Hertz to 50.5 Hertz for more than 95 percentage of time. The quarter wise frequency profile is given below:

6.         System Availability:

            The system availability for all the four quarters for the year 2004-05 remained above 98%. The quarter wise voltage wise details are given below:

 

System Voltage

Actual System Availability during the Year 2004-05

April - June

July - September

October - December

January - March

400 kV

99.93%

98.62%

99.97%

98.88%

220 kV

99.87%

98.25%

99.83%

98.71%

132 kV

99.83%

99.57%

99.83%

99.26%

Over All

99.85%

98.97%

99.12%

98.80%

 

7.   Voltage Profile:

            MPPTCL has claimed that due to the system strengthening works taken up in last couple years, barring a few incidences when the system voltage was recoded beyond the limits, the over all voltage profile of the State system has been improved. MPPTCL has averaged out the voltage wise voltage profile of the State and presented that in the following charts:

Text Box: UNDER 10% VOLTAGE              OVER 5%VOLTAGE
 
 

 

 

 

 

 

 

 

 

 

 

 

 

  

Text Box: UNDER 10% VOLTAGE              OVER 10%VOLTAGE
 
 

 

 

 

 

 

 

 

 

 

 

 

 

Text Box: UNDER 10% VOLTAGE              OVER 10%VOLTAGE
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 8.   Grid Disturbances:

      There were no grid disturbances or major breakdowns during the Year 2004-05.