"Metro Plaza", 3rd & 4th Floor, E-5 Arera Colony, Bittan Market, Bhopal – 462  016
 

 

 

 

 

                                                                      
ANALYSIS OF THE INFORMATION SUBMITTED ON MIS FORMATS BY MP POWER TRANSMISSION COMPANY LIMITED FOR THE YEAR  2005-06.

TRANSCO-QUARTERLY MIS TRANSCO                                                                                                         
Format Tr-1

The information on quantum of energy handled by the State Transmission System and the overloading of lines for continuously 2 hours
      
 

SR. NO. Description Units Target
 for the 
Qtr 1
Actual
for the
Qtr 1
Target
 for the
Qtr 2
Actual
for the
Qtr 2
Target
 for the Qtr 3
Actual
for the 
Qtr 3
Target
 for the
Qtr 4
Actual
for the 
Qtr 4
Target
 for the YEAR 
Actual
for the YEAR
Actual
for the  last
year
(04-05)
1 Total Energy Received at Interface Points_ MP Periphery (ISGS + Bi-lateral+SSGS+Other imports) MU 7230.72 6588.47 7108.01 7050.21 9477.20 9533.27 7900.48 8130.07 31716.41 31302.02 29776.07
a Energy received from State Generators including 33 KV Direct Injection to Discoms MU 3674.97 3168.40 3292.63 3265.85 4227.83 4252.35 3783.79 3872.63 14979.22 14559.23 15084.64
b 33KV Direct injection of Discom from MP Genco MU 68.79 63.31 67.58 67.04 81.39 81.39 67.85 78.93 285.61 290.67 264.73
c Energy Received from State Generators Excluding 33KV Direct injection to Discoms (a-b) MU 3606.18 3105.09 3225.05 3198.81 3904.43 4170.96 3715.96 3793.70 14451.62 14268.56 14819.91
d Energy Received from other Generators Indira Sagar MU 138.2 160.81 1354.26 1343.24 611.97 653.75 510.16 397.95 2614.59 2555.75 1321.93
e Energy received from other sources Pichhore-Matatila(UPSEB) MU 1.27 1.07 2.95 2.93 9.07 9.69 7.56 4.11 20.85 17.80 29.78
f Energy Received at Interface points between PGCIL  & MPPTCL  MU 3481.07 3308.67 2494.80 2474.51 4369.46 4667.73 3642.51 3913.59 13987.84 14364.50 13339.72
g Energy Received from Wind farm,National Steel & HEG MU 4.00 12.82 25.46 25.26 22.82 24.38 19.02 14.64 71.30 77.10  
h Energy Received from HEG Mandideep & JP Bela MU     5.49 5.45 6.32 6.76 5.27 6.08 17.08 18.29  
i Total Energy Received at Interface Points excluding 33KV Direct injection from MPPGCL(c+d+e+f+g+h) MU     7108.01 7050.21 9477.20 9533.27 7900.48 8130.07 24485.69 24713.55  
2 Total Energy Sent to Discoms (Excluding 33KV Direct injection) MU 6947.65 6365.10 6751.13 6551.39 8439.13 9015.20 7513.78 8051.14 29651.69 29982.83 28362.46
a Energy Sent to Poorve Khestra MU 2171.02 1976.17 2075.01 2013.62 2414.00 2439.13 2033.69 2232.29 8693.72 8661.21 8405.06
b Energy Sent to Paschim Khestra MU 2481.40 2297.16 2467.12 2394.13 3669.90 3709.67 3091.73 2875.81 11710.15 11276.77 9954.43
c Energy Sent to Madhya Khestra MU 2223.44 2026.08 2200.77 2135.66 2827.00 2858.43 2381.62 2567.74 9632.83 9587.91 10002.97
d. Energy Sent to other Lincessee_SEZ Indore MU 2.00 2.38 8.23 7.98 8.00 7.97 6.74 7.87 24.97 26.20 0.00
e Total Energy Sent to Discoms (Excluding 33KV Direct injection from PH only) MU 6877.86 6301.80 6751.13 6551.39 8918.90 9015.20 7513.78 7683.71