ORDER SHEET
Petition No. 3 of 2002
In
the matter of granting permission to draw 4078 KVA power during
restricted hours.
M/s Indo Rama Synthetics (I) Ltd. - Petitioner
51-A, Sector III,
Pithampur, Distt. Dhar
V/s
M.P.State Electricity Board, Jabalpur - Respondent
O R D E R
18th January, 2002
Shri Maniram Atri, Manager (Eng.) appears for the
petitioner.
Shri P.C. Porwal, Chief Engineer,
MPSEB, Jabalpur appears for the respondent Board.
The Petitioner have a unit in Pithampur in Dhar district which is
engaged in the manufacture and export of synthetic/cotton blended
yarn. The industry requires continuous supply of power to maintain
particular temperature and humidity to produce good quality yarn for
export. The petitioner's have a contract demand of 4600 KVA and MD
recorded is in the range of 2966 KVA - 4078 KVA. The petitioner have a
D.G. Set of 5.2 MW. Since their D.G. Set will be under repair for a
period of 1 ½ months, petitioner needs permission to avail 4078 KVA
power during evening peak load hours for the period for which D.G. Set
is under repair. The Board has recommended that the petitioner be
allowed to avail 3800 KVA power upto 31.07.2002 in evening peak load
hours, subject to the condition that Board will have full authority to
regulate the permitted power during system distress conditions.
Considering the facts and circumstances and recommendation of the
Board, the petitioner is allowed to avail 3800 KVA power during
evening peak load hours for a period of 2 months from the date of this
order, subject to the condition that Board can regulate the permitted
power during system distress conditions.
sd
(Justice Shacheendra Dwivedi)
Chairman
sd
(S.Iqbal Husain)
Member(P)
sd
(Rabindra Tripathy)
Member(E) |