CHAPTER 2 Review of MPSEB Performance
2.1 In the
last tariff order the Commission had, while assessing the performance of the
Board, had set certain targets relating to various operational aspects of
the Board. The Commission has taken stock of the performance of the Board in
general and with respect to the targets set in the earlier tariff order, in
particular. Observations of the Commission in this regard are discussed in
the following paragraphs. Category-wise Consumption The comparison of actual category-wise consumption with ARR filing projections and Commission’s approval has been summarized below:
An analysis of
the above table indicates that the consumption by HT 2.3
Category-wise Consumers
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Categories |
1999-00 |
2000-01 |
2001-02 |
% Increase |
|
L T
CONSUMERS |
|
|
|
|
|
Domestic |
2,714,504
|
3,227,184
|
4,036,232
|
48.69% |
|
Single Light
Point Consumers |
1,782,605
|
1,098,169
|
551,145
|
-69.08% |
|
Non-domestic |
504,994
|
533,355
|
555,376
|
9.98% |
|
Water Works |
11,192
|
12,416
|
13,589
|
21.42% |
|
Industrial |
81,485
|
83,477
|
88,274
|
8.33% |
|
Agricultural |
1,171,804
|
1,145,300
|
1,219,175
|
4.04% |
|
Street
Lights |
16,485
|
16,291
|
17,029
|
3.30% |
|
TOTAL (LT) |
6,283,069
|
6,116,192
|
6,480,819
|
3.15% |
|
H T
CONSUMERS |
|
|
|
|
|
Railway
Traction |
33 |
32 |
32 |
-3.03% |
|
Coal Mines |
35 |
36 |
39 |
11.43% |
|
Mini Steel
Plants |
16 |
14 |
15 |
-6.25% |
|
Cement
Factories |
21 |
21 |
23 |
9.52% |
|
HT
Irrigation |
60 |
58 |
58 |
-3.33% |
|
HT Water
Works |
91 |
89 |
88 |
-3.30% |
|
Other HT
consumers |
1278 |
1341 |
1362 |
6.57% |
|
RE
Co-operative Society |
14 |
14 |
4 |
-71.43% |
|
Border
Villages |
7 |
7 |
7 |
0.00% |
|
TOTAL (HT) |
1555 |
1612 |
1626 |
4.57% |
|
TOTAL LT +
HT |
6284624 |
6117804 |
6482445 |
3.15% |
It is
observed that overall increase in the number of consumers in Board’s network
has been around 3.15%. While the increase in LT category has been around
3.15%, increase in HT has been around 4.57%.
|
Years |
MPSEB |
MPERC |
Actual |
|
2001-02 |
42.88 |
42.88 |
48.77 |
The Board had
mentioned that it would be able to bring down the loss level to 42.88%
during 2001-02, which was accepted by the Commission. This meant reduction
of 8.12 percentage points. However the actual reduction has been only 2.23
percentage points.
The Board has
explained that in order to have proper assessment of energy consumed by the
agricultural consumers, an exercise/sample survey covering 1278 agricultural
consumers situated at different geographically locations of Madhya Pradesh
has been conducted. The survey covered different crops cultivated, in
various divisions, circles, region, having proper representation of all
areas, all type of crops and all type of sources of watering. Region-wise
average consumption per HP/month is as under:
|
S.No. |
Region |
Units/HP/Month |
|
1 |
Jabalpur |
72 |
|
2 |
Sagar |
83 |
|
3 |
Indore |
117 |
|
4 |
Bhopal |
98 |
|
5 |
Ujjain |
113 |
|
6 |
Rewa |
89 |
|
7 |
Gwalior |
78 |
|
Average |
98 |
|
The average
consumption per HP/month including all types of water sources, all type of
crops and all regions works out to 98 units. The aforesaid study covers a
period of about 4-5 months of the Rabi Season. Hence, the consumption for
five months of the Rabi Season may be considered as 98 units per HP/month.
Besides the Rabi Season, the consumption in other seasons of the year is
about 36% to 40% of the total consumption during the year. Accordingly, for
remaining seven months of the year, the average consumption would be about
42 to 43 units per HP/month. This will give average agricultural
consumption of 65 to 66 units per HP/month during the year 2001-02 which is
equivalent to a load factor of 12% as against 15% allowed by the Commission
for the year 2001-02. With this load factor and the consumption of 20 units
per month per connection for SC/ST Single Light Point Connections for
2001-2002 and for other SLP connections at 20 units per month per connection
for the period April 2001 to September, 2001, and 60 units per month per
connection for the period October 2001 to March 2002, The T&D losses for the
year 2001-02 works out to 48.77% which is nearly 49%. This tallies with the
findings of losses of 49% in the State based on the actual readings of the
meters installed at various sub-stations and feeders in various Divisions,
Circles and Regions for energy auditing work.
The figures of
12% load factor for agricultural consumers and T&D losses of 49% are based
on the actual study conducted by installing meters at the premises of about
1278 consumers and the readings from meters at various sub-stations and
feeders. Once 100% metering is achieved, accurate agricultural consumption
or SLP consumption and accurate loss figures will be computed. At present,
aforesaid figures are purely based on the limited study and these are
subject to change. The load factor of agricultural consumers or the T&D
loss may be somewhat different in future when full details would be
available.
While passing
the tariff order for the year 2001-02, the Commission had directed that the
T&D losses as prevailing at the end of 2000-01, which was determined at 51%,
shall be reduced to 42.88% by 2001-02. Further, the Commission had
prescribed the following programme for reduction of T&D losses over next
five years:
|
Year |
Total Loss (%) |
Reduction (%) |
|
2000-01 |
51% |
- |
|
2001-02 |
42.88 |
8.12 |
|
2002-03 |
37.00 |
5.88 |
|
2003-04 |
32.00 |
5.00 |
|
2004-05 |
28.00 |
4.00 |
|
2005-06 |
25.00 |
3.00 |
The Board has
explained that during the year 2001-02, technical losses could not be
reduced as it requires huge investment for renovation of HT/LT transmission
and distribution system. Even if sufficient investments are tied-up, it
would take considerable time to reduce such losses. Under reforms and
restructuring process, the Asian Development Bank is providing funding for
renovation of the transmission and distribution system in a phased manner
for which action has been initiated.
Actual T&D
losses for the year 2000-01 have been 50.97% as against 51% determined by
the Commission. For the year 2001-02, the estimated losses are 47.29% i.e.
a reduction of 3.7 percentage points. However, 10 nos. RE Societies have
recently been merged with the Board in the month of March, 2002 and the
losses being comparatively on higher side in REC Societies, the T&D losses
at the end of the year 2001-02 are estimated at 48.77%.
2.4.2 Steps
for reducing high Commercial Loss
For reducing high commercial loss, which is of the order of 27%, the following steps need to be initiated.
(i) Intensive checking of Jhuggi Jhopadi clusters, agriculture sector and unauthorized colony.
(ii) Meter must necessarily be installed at existing unmetered SLP and agriculture connections within the given time frame of 3 years.
(iii) Close monitoring of HT/LT industry to curb pilferage and misuse and that recorded consumption is commensurate with actual use.
(iv) Precision Electronic Meters be ensured on all HT consumers’ premises and LT industries so that theft of energy can be readily checked. No HT connection should remain defective for a duration exceeding 7 days and similar action for LT industries.
(v) Defective meters should be replaced by making monthly programme and should be ensured that the defective meters remain within the level of 2.5% i.e. 3% in the rural areas and 1.5% within the township and urban area.
(vi) 100%
meter reading of LT consumers should be ensured. Supervisory officers (JE/AE)
must be given programme to exercise checks of 5% and 10% to ensure correct
recording to ensure correctness of meter reading.
In the tariff order for the year 2001-02 approved by the Commission certain level of improvement in T&D losses was approved against which the MPSEB came out with a different programme. The MPSEB has worked out and projected monthwise circle wise programme for reduction of losses from July, 2002 to November, 2003. 13 circles out of 35 circles of the MPSEB has recorded very high level of T&D losses.
From the data presented by the MPSEB, the Tikamgarh Circle has recorded as high as 63.93 % T&D losses followed by 62.49 % in respect of Gwalior City Circle, 61.5% in respect of Rajgarh Circle and 60.36% in respect of Shivpur Circle. The analysis further indicates that only around 36% to 39% of the power injected in to the system is available for sale.
The MPSEB has been continuously arguing that high technical losses are because the required level of investment is not possible. The figures projected by the Board do not support the statement of the MPSEB for city circles controlling corporation areas, such as Gwalior (CC), Bhopal (CC) and Indore (CC) where infrastructure is relatively very good and has recorded more or less the same level of losses.
Reduction of losses as suggested in the programme of the Utility must be ensured. Accountability for failure to achieve the set targets should be fixed and stringent action should be initiated against employees concerned.
2.5 Energy
Generation
2.5.1 Power
Station- wise installed capacity as on February 2002 is as follows:
|
Units |
Capacity MW |
|
|
|
A. THERMAL
POWER STATIONS
|
|||
|
i.
Amarkantak – I |
50
|
(1x30+1x20) |
|
|
ii. Amarkantak – II |
240
|
(2x120) |
|
|
Amarkantak |
290 |
|
|
|
iii. Satpura – I |
187.50 |
(5x62.5)
--- 60 % MP’s Share |
|
|
iv. Satpura – II |
410 |
(1x
200+1x210) |
|
|
v. Satpura – III |
420 |
( 2x210) |
|
|
Satpura |
1017.50 |
|
|
|
vi. SGTPS – I |
420 |
(2x210) |
|
|
vii. SGTPS – II |
420 |
(2x210) |
|
|
SGTPS |
840 |
|
|
|
TOTAL
THERMAL |
2147.50 |
|
|
|
B. HYDEL
POWER STATIONS : |
|||
|
viii.
Gandhi Sagar |
57.50 |
( 5x23)
---50% MP’s Share |
|
|
ix. Bargi |
90.00
|
(2x45) |
|
|
x. Bansagar Tons – I |
315.00 |
(3x105) |
|
|
xi. Bansagar Tons – III |
40.00 |
(2x20)
|
|
|
xii. Birsinghpur |
20.0 |
(1x20) |
|
|
xiii. Rajghat |
22.50 |
(3x15) -50%
MP’s Share |
|
|
xiv. Pench Totladoh |
107.00 |
(2x80)
-66.67% MP’s Share |
|
|
xv. Ranapratap Sagar (Operated by RSEB) |
86.00 |
( 4x43)-
50% MP’s share |
|
|
xvi. Jawahar Sagar (Operated by RSEB) |
49.50 |
(3x33) 50%
MP’s share |
|
|
xvii. Matatila (Operated by UPSEB) |
10.00 |
(1x30) -
33% MP’s share |
|
|
TOTAL HYDEL |
797.50 |
|
|
|
C. Mini
Micro Hydel |
5.45 |
|
|
|
Grand
Total (A+B+C) |
2950.45 |
|
|
In the
inter-state project viz. Satpura Thermal Power Station No. 1 at Sarni,
MPSEB has a share of 60%, while Rajasthan owns the balance. In respect of
Hydel Station viz. Gandhi Sagar (Located in Madhya Pradesh having a capacity
of 115 MW), Rana Pratap Sagar (located in Rajasthan having a capacity of
172 MW) and Jawahar Sagar (located in Rajasthan having a capacity of 99 MW),
both the states own 50% share each. Also the MPSEB and the MSEB (of
Maharastra) have an inter state Hydel Power station namely Pench Totladoh
with a capacity of 160 MW wherein the MPSEB owns a share of 66.67 % i..e
107, MW and 33.33% (53 MW) is owned by MSEB.
Apart from inter
state power stations with the states of Rajasthan and Maharastra, Madhya
Pradesh also has inter state projects with U.P. In Rajghat which has a
capacity of 45 MW, both the state of Madhya Pradesh and UP share 50% each of
the power generated from this power station. Further, in Matatila hydel
station, which has a capacity of 30 MW, Madhya Pradesh has a share of 33%
(10 MW).
In addition to
above, the MPSEB has a share of 37.5 MW from Rihand (UP) and 5 MW from
Hirakud (Orissa). This has not been accounted for because this power is not
being physically transferred and the matter is under dispute with respective
State Govts.
Overall
performance of the thermal power stations owned by the Board for the years
1999-2000, 2000-2001 and 2001-2002 have been indicated below alongwith the
performance parameters fixed by the Commission for the year 2001-2002, for
the purpose of evaluation:
2.5.2
Plant Load Factor
|
Name of the
Power Station |
1999-2000 (actuals) |
2000-2001 (actuals) |
2001-02 |
|
|
MPERC |
Actuals |
|||
|
Amarkantak
T.P.S. |
50.90% |
45.3% |
45.5% |
38.99% |
|
Satpura
T.P.S. |
76.9% |
72.0% |
76.2% |
73.10% |
|
SGTPS
Birsinghpur |
70.0% |
66.8% |
73.0% |
57.28% |
|
All Thermal |
70.8% |
66.7% |
71.1% |
62.90% |
2.5.3 Auxiliary Power Consumption
|
Amarkantak
T.P.S. |
10.43% |
10.36% |
10.0% |
11.33% |
|
Satpura
T.P.S. |
8.77% |
8.93% |
8.8% |
8.88% |
|
SGTPS
Birsinghpur |
10.52% |
10.22% |
9.0% |
11.07% |
|
All Thermal |
9.43% |
9.5% |
9.0% |
9.77% |
2.5.4
Specific Oil Consumption (ml/KWhr)
|
Amarkantak
T.P.S. |
3.56 |
7.318 |
- |
14.067 |
|
Satpura
T.P.S. |
1.63 |
2.07 |
- |
3.14 |
|
SGTPS
Birsinghpur |
2.48 |
4.9 |
- |
4.80 |
|
All Thermal |
2.16 |
3.79 |
2.94 |
4.56 |
2.5.5 Station Heat Rate (kCal/ kWhr)
|
Amarkantak
T.P.S. |
2896 |
3330 |
2869 |
3572 |
|
Satpura
T.P.S. |
2698 |
2870 |
2689 |
3035 |
|
SGTPS
Birsinghpur |
4347 |
3120 |
2689 |
3195 |
|
All Thermal |
3317 |
3002 |
2704 |
3137 |
It is evident
from the above data that the performance of the above thermal power stations
has deteriorated during the past three years and the PUF during the year
2001-02 declined to 62.9% against the target of 71.1% fixed by the
Commission. Similarly, the parameters for auxiliary power consumption, fuel
oil consumption and station heat rate achieved, have not been comparable.
2.5.6 Reasons for the lower performance are attributed mainly to the following:
i. Lack
of timely maintenance of the units owing to pressing demand for the power in
the state.
ii. Unforeseen outages resulting from ageing.
iii. Non-availability of spares in adequate quantity.
iv. Lack of funds resulting in the deferment of
refurbishment/renovation/modernization activities of the units.
v. Non–supply of adequate quantity and quality of coal as per the
linkage decided by the Standing Linkage Committee.
Reasons for poor
performance of each station are discussed in following paragraphs.
AMARKANTAK
THERMAL POWER STATION
(Capacity: 1x30+1x20+2x120= 290 MW)
i)
The 2x30 MW units of this power station (out of which one has already been
derated to 20 MW capacity) were commissioned during 1965 and are as old as
36 years. Though the Board is striving to take up the refurbishment works,
they are yet to be awarded. Further, there has been a problem of
non-availability of coal mills spares resulting in the operation of only one
unit at a time.
ii) The 2x120 MW units were commissioned during 1977-78.
The units are not working satisfactorily in as much as they do not generate
beyond 90 MW capacity each. Their R & M works have got held up owing to the
backing out of M/s Ensaldo Energia of Italy who were awarded this work.
Therefore, the performance of these units could not be achieved to the
desired level during the year 2001-02 as was envisaged.
In view of the