|
Sl. No
|
Particulars of Charges
|
Unit
|
Charges/Rate
|
|
1
|
Changing of meter/meter/board
|
|
|
|
|
1. Changing or removing of meter board
|
Per job
|
Rs. 50/-
|
|
|
2. Changing of meter at the consumer's
request
|
Per job
|
Rs. 75/-
|
|
|
3. Resealing of cut out in consumer's premises
if seal found broken
|
Per job
|
Rs. 55/-
|
|
|
4. Resealing of meter, MD indicator and
instruments in Consumers’ premises if seal is
found broken
|
Per job
|
|
|
|
(a) For single phase connections
|
|
|
|
|
(i) L & F connection
|
“
|
Rs. 65/-
|
|
|
(ii) Power connection. (Other than light and
fan)
|
“
|
Rs. 112/-
|
|
|
(b) For Three phase LT connections
|
|
|
|
|
(I) Industrial connection upto 10 BHP
|
“
|
Rs. 214/-
|
|
|
(ii) Industrial connection above 10 BHP
|
“
|
Rs. 437/-
|
|
|
(iii) Irrigation consumer upto 5 HP
|
“
|
Rs. 65/-
|
|
|
(iv) Irrigation consumer for load above 5
HP
|
“
|
Rs. 108/-
|
|
|
(c) For All HT connection
|
“
|
Rs. 865/-
|
|
|
|
|
|
|
2
|
Replacement of fuses/glass/meter cards
|
|
|
|
|
1. Replacement of cut out fuses
|
Per job
|
Rs. 20/- for one fuse or more than one fuse if
all replaced at the same time.
|
|
|
2. Replacement of consumer’s fuses (LT)
|
“
|
Rs. 20/-
|
|
|
3. Replacement of missing meter cards
|
Per card
|
Rs. 10/- per card including clerical charges
|
|
|
4. Replacement of broken glass etc
|
Per glass
|
Rs. 24/-
|
|
|
|
|
|
|
3
|
Reconnection Charges
|
|
|
|
|
(I) Upto 10 kW
|
|
|
|
|
At cut out
|
Per job
|
Rs. 65/-
|
|
|
At over head main
|
“
|
Rs. 150/-
|
|
|
At undergound main
|
“
|
Rs. 400/-
|
|
|
(ii) Over 10 kW upto 75 kW
|
“
|
Add 25% to (I) above.
|
|
|
(iii) Over 75 kW (Special charges according
to condition of load)
|
“
|
Add 50% to (i) above
|
|
|
|
|
|
|
4
|
Checking and Testing charges of various
equipments on consumer's request
|
|
|
|
|
1. Contest fee for billing meters:
|
|
|
|
|
(a) Single phase energy meters
|
Per meter
|
Rs. 50/-
|
|
|
(b) Three phase meters w/o LT, CTs
|
“
|
Rs. 75/-
|
|
|
(c) Three phase meter with LT, CTs
|
“
|
Rs. 1000/-
|
|
|
(d) Special meter Bivector/Trivector
|
“
|
Rs. 1000/-
|
|
|
(e) Recording Type watt-hour Meters
|
“
|
Rs. 170/-
|
|
|
(f) Maximum demand indicator/special
meters
|
“
|
Rs. 335/-
|
|
|
(g) Ammeters and Voltmeters
|
“
|
Rs. 65/-
|
|
|
(h) Initial testing of meter at the time
of installation
|
“
|
Nil
|
|
|
(i) Subsequent testing and installation
|
“
|
Rs. 80/-
|
|
|
|
|
|
|
5
|
Charges for hire of metering system
|
|
|
|
|
|
|
|
|
|
Where it is property of Board
|
|
|
|
|
(1) For 230/440 Voltages
|
|
|
|
|
(a) Single phase meter
|
|
|
|
|
(i) Without M.C.B.
|
Per meter/month
|
For Domestic, now
embedded in the tariff and hence not to be
levied separately
Rs. 12/-
|
|
|
(ii) With M.C.B.
|
Per meter/month
|
Rs. 16/-
|
|
|
(b) Poly Phase meter
|
|
|
|
|
(i) Without M.C.B.
|
Per meter/month
|
Rs. 25/-
|
|
|
(ii) With M.C.B.
|
Per meter/month
|
Rs. 36/-
|
|
|
(iii) LT Meter with CTs
|
Per meter/month
|
Rs. 45/-
|
|
|
(iv) Demand or Speical type of
meter
|
Per meter/month
|
Rs. 184/- or 2.3% per month per rupees of cost
of metering system, whichever is higher
|
|
|
(2) For 11 kV Voltages
|
|
|
|
|
(I) Electromagnetic meter
|
Per meter/month
|
Rs. 920/-
|
|
|
(ii) Electro-static meter
|
Per meter/month
|
Rs.1540/-
|
|
|
(3) For 33 kV Voltages
|
|
|
|
|
(I) Electromagnetic meter
|
Per meter/month
|
Rs. 1560/-
|
|
|
(ii) Electro-static meter
|
Per meter/month
|
Rs. 2040/-
|
|
|
(4) For 132 kV Voltages
|
|
|
|
|
(I) Electromagnetic meter
|
Per meter/month
|
Rs. 15630/-
|
|
|
(ii) Electro-static meter
|
Per meter/month
|
Rs. 16120/-
|
|
|
(5) For 220 kV Voltage
|
|
|
|
|
(I) Electromagnetic meter
|
Per meter/month
|
Rs. 32250/-
|
|
|
(ii) Electro-static meter
|
Per meter/month
|
Rs. 32730/-
|
|
|
(6) For Special metering such as summation
metering etc.
|
Per meter/month
|
2.3% of the cost of per metering and allied
equipments
|
|
|
(7) The HT consumers existing as on
30.6.2000
|
Per meter/month
|
2.3% per month per rupee of cost of metering
system.
|
|
|
|
|
|