"Metro Plaza", 3rd & 4th Floor, E-5 Arera Colony, Bittan Market, Bhopal – 462  016
 

 

 

 

 

Contact Nos
Complaints/ Suggestion

 

Application for consent of the Commission for Captive Power Plant

To,

The Secretary,  
M.P. Electricity Regulatory Commission,  
Urjha Bhawan,  
Shivaji Nagar,  
Bhopal-462016  

Application for consent of the Commission for Captive Power Plant

Sir,  

The undersigned request the Commission for consent to set-up New Captive Power Plant/renewal for existing CPP. In this regard, the following documents are enclosed herewith for your kind consideration:-

1.            Salient details of the CPP installation as per format for Application Form (Annexure-I)
2.            Affidavit as per Annexure II  
3.            Supporting documents to establish that the Captive Power Plant (CPP) is being set up by
               us and that we are the owners of this plant.  
4.           4 Nos. copies of the Feasibility Report as per guidelines of Authority (applicable for capacity    more  than 25 MW)*.  
5.         Demand Draft No____________ Dated_________ for Rs. ________ (Rupees_______________)                drawn in favour of  MPERC payable at Bhopal.  
6.         Acknowledgement of submission of a copy of application to Utility.  
7.
                  Power of attorney /Company's resolution authorizing signatory.   
8.
                   Copy of latest electricity bill paid.
9.         
Layout plan, if the capacity is 1 MW or above.*

                Kindly convey Commission’s consent.
  

Encl : As above.

Date:                                                                                       Signature

                                                                                                Name :

Place:                                                                                      Address:

  Copy to.- Designated Officer of the Utility, with the request to forward the comments to the Commission on Affidavit within 21 days of receipt of this Application.

*Strike out if not applicable.  

ANNEXURE-I 

APPLICATION FORM FOR GRANT/RENEWAL OF CONSENT BY THE COMMISSION UNDER SECTION-21 (3) OF MADHYA PRADESH VIDHYUT SUDHAR ADHINIYAM 2000 FOR CAPTIVE POWER PLANT 

1.

General :
 

 

 

(i)

Name of the Applicant

 

 

(ii)

Address of Registered Office

 

 

(iii)

Postal Address for Communication  
Phone No.  
Fax No.  
E-Mail.

 

 

(iv)

Address of proposed Captive Power Plant

 

 

(v)

Particulars of the application processing/permission fee:  
a) Demand Draft No. and Date  
b) Amount (Rs.)
 

 

2.

Details of Industry :
 

 

 

(i)

Brief description of the process of the Industry

 

 

(ii)

Peak power requirement of the industry  

 

 

(iii)

Is the Industry of continuous process type? (If yes, please provide justification and details).

 

 

(iv)

Amount of power required for the critical section(s) of continuous process. 

 

 

(v)

Whether the industry requires stringent tolerance limit in voltage & frequency? (If yes, please provide justification and details). 

 

 

(vi)

Amount of power required for the critical section(s) sensitive to voltage and frequency variation.  

 

3.

Details of Supply from Utility:  
 

 

 

(i)

Service Connection No.

 

 

(ii)

Contract Demand in KVA

 

 

(iii)

Voltage of Supply

 

 

(iv)

Total Connected Load

 

 

(v)

Date of Connection

 

 

(vi)

Tariff (Category)

 

 

(vii)

Highest MD recorded during last one year.

 

 

(viii)

History of reduction of Contract Demand, if any, since date of connection.  

 

 

(ix)

Date of Agreement 

 

 

(x)

Arrears:  
 - Arrears of Utility 
 - Whether Elec. Duty/Cess paid (Give proof)

 


4.    DETAILS OF PROPOSED GENERATING SETS REQUIRING PERMISSION:  

S. No

Capacity
(KVA/MVA)

Particular of Set Make/S.No./ Yr. of Manufacture

Date of Establishment

Type of CPP*

Type of Use***

Remarks

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

                Total capacity in KVA/MVA
Note. –
In case the new Generating set has already been commissioned without valid permission, please give reasons.  

5.   (A)   DETAILS OF GENERATING SETS REQUIRING RENEWAL PERMISSION:  

S.No.

Capacity KVA/MVA

Particular of Set Make/S.No./ Yr. of Manufacture

Type of CPP*

Date of Establishment

Ref. of Permission** 

Date of expiry of permission

Type of Use***

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Total Cap. in KVA/MVA

    (B) Details of existing Generator Set, with valid permission, not requiring renewal:  

S.No.

Capacity  KVA/MVA

Particular of Set Make/S.No./ Yr. of Manufacture

Type of CPP*

Date of Establishment

Ref. of Permission** 

Date of expiry of permission

Type of Use***

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

                          Total Cap. in  KVA/MVA

     *   Coal/Gas/Diesel/Naphta/Co-generation/ Hydro/Non –Conventional/ others.
     **  Enclose Copy of earlier permission letter and renewals, if any.
     *** Standby or simultaneous use in isolation or Parallel with Utility's Supply.
 

 

6.

In case generation station is proposed to be run in parallel with Utility's supply:  
 

 

(i)

Nearest point of interconnection and synchronization with the grid

 

 

(ii)

Voltage at which interconnection/synchronization with system is proposed

 

 

(iii)

Preventing arrangement against back feeding to the system, in case of failure of grid supply.

 

7.

Details of proposed utilization of CPP and other operational details:    
 

 

(i)

Standby set to run only on failure of Utility’s supply .

Yes/No

 

(ii)

Continuous use in isolation of Board’s supply

Yes/No

 

(iii)

Is it non-conventional energy based or cogeneration plant? If yes, please indicate the resources.

 

 

(iv)

What is the total monthly power requirement ?

 

 

(vi)

Whether supply from Utility is in the category of continuous process industry?

 

8.

Other Technical & Financial Particulars:   
 

 

(i)

If the capacity of CPP is higher than the contracted demand, state the reasons of such additional requirement

 

 

(ii)

What are the fool proof arrangement to ensure standby use.

 

 

(iii)

Cost per MW/KW of generating capacity

 

 

(iv)

Cost per unit of generation:  
a)  Fixed  
b)  Variable  
c) Total

 

 

(v)

Operating Plant Load Factor

 

  9.

  If there is an agreement for sale of surplus power to Utility, indicate details.   
 

10.

For Generator sets running without valid permission/renewal.  Furnish Certificate from Electrical Inspectorate and Utility for upto date payment of ED and Cess.    
 

Date:  
Place:

 

Signature
 
Name of the Applicant
: