Application for consent of the Commission for Captive Power Plant
To,
The Secretary,
M.P. Electricity Regulatory Commission,
Urjha Bhawan,
Shivaji Nagar,
Bhopal-462016
Application for
consent of the Commission for Captive Power Plant
Sir,
The undersigned request
the Commission for consent to set-up New Captive Power Plant/renewal for
existing CPP. In this regard, the following documents are enclosed
herewith for your kind consideration:-
1. Salient
details of the CPP installation as per format for Application Form
(Annexure-I)
2. Affidavit as per Annexure II
3. Supporting documents to establish that the Captive Power
Plant (CPP) is being set up by
us and that we are the owners of this plant.
4. 4 Nos. copies of the Feasibility Report as per guidelines of
Authority (applicable for capacity more than 25 MW)*.
5. Demand Draft No____________ Dated_________ for Rs. ________
(Rupees_______________) drawn in favour of MPERC payable
at Bhopal.
6. Acknowledgement of submission of a copy of application to
Utility.
7.
Power of attorney /Company's resolution authorizing signatory.
8.
Copy of latest electricity bill paid.
9.
Layout plan, if
the capacity is 1 MW or above.*
Kindly convey Commission’s consent.
Encl : As above.
Date:
Signature
Name :
Place:
Address:
Copy to.-
Designated Officer of the Utility, with the request to forward the
comments to the Commission on Affidavit within 21 days of receipt of this
Application.
*Strike out if not
applicable.
ANNEXURE-I
APPLICATION FORM FOR GRANT/RENEWAL OF CONSENT BY THE COMMISSION UNDER
SECTION-21 (3) OF MADHYA PRADESH VIDHYUT SUDHAR ADHINIYAM 2000 FOR CAPTIVE
POWER PLANT
|
1.
|
General
:
|
|
|
|
(i)
|
Name of the
Applicant |
|
|
|
(ii)
|
Address of
Registered Office
|
|
|
|
(iii)
|
Postal Address for
Communication
Phone No.
Fax No.
E-Mail.
|
|
|
|
(iv)
|
Address of proposed
Captive Power Plant
|
|
|
|
(v)
|
Particulars of the
application processing/permission fee:
a) Demand Draft No. and Date
b) Amount (Rs.)
|
|
|
2.
|
Details of Industry :
|
|
|
|
(i)
|
Brief description of
the process of the Industry
|
|
|
|
(ii)
|
Peak power
requirement of the industry |
|
|
|
(iii)
|
Is the Industry of
continuous process type? (If yes, please provide justification and
details). |
|
|
|
(iv)
|
Amount of power
required for the critical section(s) of continuous process.
|
|
|
|
(v)
|
Whether the industry
requires stringent tolerance limit in voltage & frequency? (If yes,
please provide justification and details). |
|
|
|
(vi)
|
Amount of power
required for the critical section(s) sensitive to voltage and
frequency variation. |
|
|
3.
|
Details of Supply
from Utility:
|
|
|
|
(i)
|
Service Connection
No.
|
|
|
|
(ii)
|
Contract Demand in
KVA
|
|
|
|
(iii)
|
Voltage of Supply
|
|
|
|
(iv)
|
Total Connected Load
|
|
|
|
(v)
|
Date of Connection
|
|
|
|
(vi)
|
Tariff (Category)
|
|
|
|
(vii)
|
Highest MD recorded
during last one year.
|
|
|
|
(viii)
|
History of reduction
of Contract Demand, if any, since date of connection.
|
|
|
|
(ix) |
Date of Agreement
|
|
|
|
(x)
|
Arrears:
- Arrears of Utility
- Whether Elec. Duty/Cess paid (Give proof)
|
|
4. DETAILS OF PROPOSED GENERATING SETS
REQUIRING PERMISSION:
|
S. No
|
Capacity
(KVA/MVA)
|
Particular of Set
Make/S.No./ Yr. of Manufacture
|
Date of
Establishment |
Type of CPP*
|
Type of Use***
|
Remarks
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S.No.
|
Capacity KVA/MVA
|
Particular of Set
Make/S.No./ Yr. of Manufacture
|
Type of CPP*
|
Date of
Establishment |
Ref. of
Permission** |
Date of expiry of
permission
|
Type of Use***
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Cap. in KVA/MVA
(B) Details of
existing Generator Set, with valid permission, not requiring renewal:
|
S.No.
|
Capacity KVA/MVA
|
Particular of Set
Make/S.No./ Yr. of Manufacture
|
Type of CPP*
|
Date of
Establishment |
Ref. of
Permission** |
Date of expiry of
permission
|
Type of Use***
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Cap. in KVA/MVA
*
Coal/Gas/Diesel/Naphta/Co-generation/ Hydro/Non –Conventional/ others.
** Enclose Copy of earlier permission letter and renewals, if any.
*** Standby or simultaneous use in isolation or Parallel with
Utility's Supply.
|
6. |
In case generation
station is proposed to be run in parallel with Utility's supply:
|
|
|
(i)
|
Nearest point of
interconnection and synchronization with the grid
|
|
|
|
(ii)
|
Voltage at which
interconnection/synchronization with system is proposed
|
|
|
|
(iii)
|
Preventing
arrangement against back feeding to the system, in case of failure of
grid supply.
|
|
|
7.
|
Details of proposed
utilization of CPP and other operational details:
|
|
|
(i)
|
Standby set to run
only on failure of Utility’s supply . |
Yes/No
|
|
|
(ii)
|
Continuous use in
isolation of Board’s supply
|
Yes/No
|
|
|
(iii)
|
Is it
non-conventional energy based or cogeneration plant? If yes, please
indicate the resources.
|
|
|
|
(iv)
|
What is the total
monthly power requirement ? |
|
|
|
(vi)
|
Whether supply from
Utility is in the category of continuous process industry?
|
|
|
8.
|
Other Technical &
Financial Particulars:
|
|
|
(i)
|
If the capacity of
CPP is higher than the contracted demand, state the reasons of such
additional requirement
|
|
|
|
(ii)
|
What are the fool
proof arrangement to ensure standby use.
|
|
|
|
(iii)
|
Cost per MW/KW of
generating capacity
|
|
|
|
(iv)
|
Cost per unit of
generation:
a) Fixed
b) Variable
c) Total
|
|
|
|
(v)
|
Operating Plant Load
Factor
|
|
|
9.
|
If there is an
agreement for sale of surplus power to Utility, indicate details.
|
|
10.
|
For Generator sets
running without valid permission/renewal. Furnish Certificate from
Electrical Inspectorate and Utility for upto date payment of ED and
Cess.
|
|
Date:
Place:
|
|
Signature
Name of the Applicant:
|