Tariff
Schedule – LV - 6
POWER
FOR AGRICULTURAL INSTALLATIONS
POWER
FOR AGRICULTURAL INSTALLATIONS
1
Applicability:
These
tariffs are applicable to agricultural pump connections, chaff
cutters, winnowing machines, sugarcane crusher, irrigation pumps
of lift irrigation schemes of State Government or its agencies,
nurseries without commercial motive; water drawn by agriculture
pumps used by agriculture labour, cattles, birds including
poultry and farm houses in the same premises of agriculture farm
for drinking purposes only.
2
Character of service:
Alternating
Current, 50 cycles, single/three phase 230/400 Volts or above
depending upon the availability of voltage of supply.
TOP
3
Point of Supply:
Energy
will be supplied to the consumer at a single point.
4
Tariff:
|
|
Category
of consumers
|
Fixed
Charges
|
Energy
Charges
|
|
|
|
|
|
|
|
LV
- 6
|
|
|
|
6.0
|
Agricultural
consumers
|
|
|
|
6.1
|
Metered
supply
|
NIL
|
240
paise per unit
|
|
6.2
|
Flat
rate supply
|
|
Flat
Rate
(Rs.
per HP per month)
|
|
6.2.1
|
Upto
3 HP
|
|
Rs.
190/-
|
|
6.2.2
|
Above
3HP upto 5HP
|
|
Rs.
224/-
|
|
6.2.3
|
Above
5HP upto 10HP
|
|
Rs.
230/-
|
|
6.2.4
|
Above
10HP upto 20HP
|
|
Rs.
268/-
|
Important
: The above rates shall be reduced by 50% if the State
Government agrees to provide subsidy to MPSEB at the rate of Rs.
184 crore for each quarter in advance. This amount will also
include the accrual on account of Electricity Duty and Cess
being collected by MPSEB and this accrual should be adjusted on
a monthly basis by the State Government.
Thus,
in the event of Government Subsidy being available to MPSEB, the
rates shall be as below :
|
Metered
supply
: 120p/u
|
|
Flat
rate supply
|
|
Upto
3 HP
: Rs. 95/- per HP per month
|
|
Above
3HP upto 5HP
: Rs. 112/- per HP per month
|
|
Above
5HP upto 10HP : Rs.
115/- per HP per month
|
|
Above
10HP upto 20HP : Rs. 134/- per HP
per month
|
TOP
Notes
:
i)
One 40 W lamp is permitted at or near the pump in the power
circuit
ii)
Under Tariff 6.2 – Flat rate supply, one lamp of 40 watts is
permitted at or near the pump in the power circuit of an
agricultural installation and charges at flat rate of Rs.15/-
per month shall be levied in addition to the aforesaid tariff.
iii)
Ordinarily no new agricultural connection with Induction motor(s)
of capacity 3 HP and above would be given without suitable
capacitors to improve the Power Factor.
iv)
The use of agriculture pump by installing external device during
the period the supply is available on single phase, shall be
treated as illegal extraction of energy and the action as
per the prevailing rules and regulations shall be taken against
the defaulting consumer.
v)
This tariff is based on the assumption that the power supply on
three-phase shall normally be made available by MPSEB for 6
hours a day or 36 hours in a week. However, there may be
some areas where agriculture consumers may require power for
longer duration and are willing to pay additional amount for the
extra hours of supply. In order to facilitate such supply
the flat rate or the energy charge of metered connections, as
the case may be, shall be 1.5 times the normal rate provided the
three-phase power supply is made available by the Board for 12
hours a day or 72 hours a week.
The
above arrangement of enhanced hours of supply shall be made by
the Board only on receipt of written consent of atleast 80%
agriculture consumers on a particular, predominantly
agricultural feeder agreeing to pay higher charges as above,
subject to the condition that there are no arrears against the
consumers on that feeder.
TOP
5
Minimum Charge:
Charges
equivalent to 360 unit per annum per HP or part thereof of
the connected load shall be payable by Consumers under Tariff
6.1 (metered supply).
6
Important note for consumers :
Timely
payment of bills by the consumers
The
Commission is of the view that alongwith ensuring timely
distribution of bills by the utility to the consumers, the
consumers also have a moral responsibility for making timely
payment of bills to the utility for the commodity and the
services availed.
In
exceptional case of non-receipt of bill by the consumer within
15 days of reading of meter or 20 days of the due date of
payment of preceeding month’s bill, the consumer is expected
to collect the bill himself from the utility office and make
payment before due date. In case of any non-cooperation in
making available the duplicate bill, concerned MPSEB officer
will be held responsible.
7
Billing in case of defective meters (for Consumers under Tariff
6.1 - metered supply).
The
consumer shall be billed for the period when the meter has
become defective on the basis of average consumption during the
same crop season in previous year. In cases where the
recorded consumption of past crop seasons is not available or
partially available prior to the date meter became defective,
the consumption pattern of the crop season subsequent to the
installation of repaired/replaced meter shall be taken for
estimation of consumption. This charge shall be levied
till the meter is repaired/replaced and metering restored on the
actual consumption basis.
8
Rounding off
All
bills will be rounded off to the nearest rupee.
9
Other Terms and Conditions
a)
Late payment Surcharge: If the bills are not paid by the
consumers within the period (due date) prescribed, a surcharge
of 1.5% per month of the total amount of monthly bill (including
outstanding arrears) will be payable in addition.
b)
Fuel/ Variable Cost Adjustment (VCA) Charge: Fuel charge/ VCA
charge, if any, shall be levied in addition to energy
charge.
c)
Meter Hire – Meter Hire shall be charged as per the Schedule
of Miscellaneous Charges. Part of a month will be reckoned as
full month for purpose of billing
d)
The foregoing tariffs are applicable to connections having
connected load not exceeding 100 HP . Consumers having existing
load in excess of 100 HP are allowed time till 30th June, 2003
for conversion of their connection from LT to HT supply. Such
consumers will have to pay Transformer rent and 3% losses
separately upto the time the transformer is installed by the
consumer. In future if any consumer is found having connected
load more than 100 HP , the consumer will be required to convert
to HT within six months from date of checking.
e)
Ordinarily, no new supply to LT installations with induction
motor/s of capacity of 3 HP and above will be given unless
suitable capacitors to improve the power factor, are installed.
f)
Every power consumer whose connected load includes
induction motor/s of capacity of 3 HP and above, shall arrange
to install Low Tension Shunt Capacitors at his cost across
the terminals of his motors of the rating specified herein
below:-
____________________________________________________________________________
Sl.No.
Rating of individual
Induction motor kVA rating of
LT capacitors.
1.
3 HP and above up to 5 HP
1
2.
Above 5 HP to 7.5 HP
2
3.
Above 7.5 HP to 10 HP
3
4.
Above 10 HP to 15 HP
4
5.
Above 15 HP to 20 HP
5
6.
Above 20 HP to 30 HP
6
7.
Above 30 HP to 40 HP
7
8.
Above 40 HP to 50 HP
8
9.
Above 50 HP to 100 HP
9
g)
The foregoing tariff is applicable to the extent of the
connected load for which the agreement subsists between the
Board and the consumer. In case the connected load in the
consumer's premises is at any time found in excess of what has
been agreed to between the consumer and the Board, the consumer
shall have to pay in respect of units (including minimum charge)
corresponding to the excess load at 1.5 times the normal tariff
rate (inclusive of Fuel/Variable Cost Adjustment Charge, if
any), for previous three months immediately preceding the date
of inspection, unless the onus is rebutted by the consumer.
h)
In case of any dispute on applicability of tariff on a
particular LT category , the decision of the Commission shall be
final and binding.
i)
The tariff does not include any tax or duty, etc. on
electrical energy that may be payable at any time in accordance
with any law then in force. Such charges, if any, shall be
payable by the consumer in addition to the tariff charges.
j)
Notwithstanding the provisions, if any, contrary to the
agreement entered into by the consumer with the Board, all
conditions prescribed herein shall be applicable to the
consumer.
PREVIOUS