"Metro Plaza", 3rd & 4th Floor, E-5 Arera Colony, Bittan Market, Bhopal – 462  016

 
 

Tariff Schedule – LV - 3

X-RAYPLANTS :

 

 

X-RAYPLANTS :

1           Applicability:

 This tariff is applicable X-Ray plants excluding Composite installations.

2           Character of service:

Alternating Current, 50 cycles single phase/ three phase 230Volts or above depending upon the availability of voltage.

TOP 

3            Point of Supply:

Energy will be supplied to the consumer at a single point. 

4                 Tariff:

Category of consumers

Fixed Charges
per month per machine

 

Energy Charges
paise per unit

 

 

 

 

LV - 3

 

 

3.0

X-Ray Plants

 

 

 

Single phase connection

Rs. 400/-

575

 

Three phase connection

Rs. 600/-

575

 

TOP 

5       Billing in case of defective meters

 The consumer shall be billed for the period, when the meter has become defective, on the basis of average consumption of previous three meter reading cycles.  In cases where the recorded consumption of past three meter reading cycles, prior to the date meter became defective, is either not available or partially available, the consumption pattern of three meter reading cycles subsequent to the installation of repaired/replaced meter shall be taken for estimation of consumption.  This charge shall be levied till the meter is repaired/replaced and metering restored on the actual consumption basis.

6                 Rounding off

All bills will be rounded off to the nearest rupee.

7         Other Terms and Conditions

a)      Late payment Surcharge: If the bills are not paid by the consumers within the period (due date) prescribed, a surcharge of 1.5% per month of the total amount of monthly bill (including outstanding arrears) will be payable in addition.

b)      Fuel/ Variable Cost Adjustment (VCA) Charge: Fuel charge/ VCA charge, if any, shall be levied  in addition to energy charge.

c)      Meter Hire – Meter Hire shall be charged as per the Schedule of Miscellaneous Charges. Part of a month will be reckoned as full month for purpose of billing.

d)      The foregoing tariffs are applicable to  connections having connected load not exceeding 100 HP (75 kW) . Consumers having existing load in excess of 100 HP (75 kW) are allowed time till 30th June, 2003 for conversion of their connection from LT to HT supply. Such consumers will have to pay Transformer rent and 3% losses separately upto the time the transformer is installed by the consumer. In future if any consumer is found having connected load more than 100 HP(75 kW), the consumer will be required to convert to HT within six months from date of checking.

e)      In case of any dispute on applicability of tariff on a particular LT category , the decision of the Commission shall be final and binding.

f)        The tariff does not include any tax or duty, etc. on electrical energy that may be payable at any time in accordance with any law then in force. Such charges, if any, shall be payable by the consumer in addition to the tariff charges.  

g)      Notwithstanding the provisions, if any, contrary to the agreement entered into by the consumer with the Board, all conditions prescribed herein shall be applicable to the consumer.

 

 PREVIOUS |TOP| NEXT