|
Tariff
Schedule – LV - 3
X-RAYPLANTS
:
X-RAYPLANTS
:
1
Applicability:
This
tariff is applicable X-Ray plants excluding Composite
installations.
2
Character of service:
Alternating
Current, 50 cycles single phase/ three phase 230Volts or above
depending upon the availability of voltage.
TOP
3
Point of Supply:
Energy
will be supplied to the consumer at a single point.
4
Tariff:
|
|
Category
of consumers
|
Fixed
Charges
per month per machine
|
Energy
Charges
paise per unit
|
|
|
|
|
|
|
|
LV
- 3
|
|
|
|
3.0
|
X-Ray
Plants
|
|
|
|
|
Single
phase connection
|
Rs.
400/-
|
575
|
|
|
Three
phase connection
|
Rs.
600/-
|
575
|
TOP
5
Billing in
case of defective meters
The
consumer shall be billed for the period, when the meter has
become defective, on the basis of average consumption of
previous three meter reading cycles. In cases where the
recorded consumption of past three meter reading cycles, prior
to the date meter became defective, is either not available or
partially available, the consumption pattern of three meter
reading cycles subsequent to the installation of
repaired/replaced meter shall be taken for estimation of
consumption. This charge shall be levied till the meter is
repaired/replaced and metering restored on the actual
consumption basis.
6
Rounding off
All
bills will be rounded off to the nearest rupee.
7
Other Terms and Conditions
a)
Late payment Surcharge: If the bills are not paid by the
consumers within the period (due date) prescribed, a surcharge
of 1.5% per month of the total amount of monthly bill (including
outstanding arrears) will be payable in addition.
b)
Fuel/ Variable Cost Adjustment (VCA) Charge: Fuel charge/
VCA charge, if any, shall be levied in addition to energy
charge.
c)
Meter Hire – Meter Hire shall be charged as per the
Schedule of Miscellaneous Charges. Part of a month will be
reckoned as full month for purpose of billing.
d)
The foregoing tariffs are applicable to connections having
connected load not exceeding 100 HP (75 kW) . Consumers having
existing load in excess of 100 HP (75 kW) are allowed time till
30th June, 2003 for conversion of their connection from LT to HT
supply. Such consumers will have to pay Transformer rent and 3%
losses separately upto the time the transformer is installed by
the consumer. In future if any consumer is found having
connected load more than 100 HP(75 kW), the consumer will be
required to convert to HT within six months from date of
checking.
e)
In case of any dispute on applicability of tariff on a
particular LT category , the decision of the Commission shall be
final and binding.
f)
The tariff does not include any tax or duty, etc. on electrical
energy that may be payable at any time in accordance with any
law then in force. Such charges, if any, shall be payable by the
consumer in addition to the tariff charges.
g)
Notwithstanding the provisions, if any, contrary to the
agreement entered into by the consumer with the Board, all
conditions prescribed herein shall be applicable to the
consumer.
PREVIOUS
|TOP| NEXT
|