Tariff
Schedule – LV - 10
Temporary
Supply
Temporary
Supply
1
Applicability:
This
tariff is for connections of temporary nature. The applicability
shall be as given in respective category rate schedule.
Temporary
supply can not be demanded by a prospective consumer as a matter
of right but will normally be arranged by the Board when a
requisition giving due notice is made.
2
Character of service:
Alternating
Current, single/ three phase, 50 cycles, 230 volts or above
depending upon the availability of the voltage of supply and at
the sole discretion of MPSEB.
TOP
3
Point of Supply:
The
power will be supplied to the consumers ordinarily at a single
point for the entire premises.
4
Tariff:
|
Category
|
Chargeable
units
|
Tariff
|
|
LV
10.1 Domestic lights
and fans and power
|
For
all units consumed
|
(a)
Fixed Charge :
(i)
For single phase Rs. 90/-per month or part thereof.
(ii)
For three phase Rs. 225/-per month or part thereof.
|
|
PLUS
|
|
(b)
Energy Charges : 450 p/unit
|
|
LV
10.2 Non Domestic Light and Fans
|
For
all units consumed
|
|
|
|
|
(b)
Energy Charges : 525 ps/unit
|
|
LV
10.3 Water Works
|
For
all units consumed
|
405
paise per unit subject to minimum charge Rs.120/- per
month or part thereof per HP or part thereof of connected
load.
|
|
LV10.4.1:Industrial For
connected load not exceeding 25 HP
|
For
all units consumed
|
600
paise per unit subject to minimum charge of Rs.
270/- per month or part thereof per HP or part thereof of
the connected load.
|
|
LV10.4.2:Industrial For
connected load above 25 HP but not exceeding 100 HP
|
For
all units consumed
|
790
paise per unit subject to minimum charge of Rs.
355/- per month or part thereof per HP or part thereof of
the connected load.
|
|
LV
10.5 Agricultural Connections : (Only metered
temporary supply shall be provided for agricultural
connections)
|
For
all units consumed
|
180
paise per unit subject to minimum charge of 30 units per
month or part thereof per HP or part thereof the connected
load.
|
Notes
a)
Tariff under LV 10.5 i.e. temporary supply for agricultural
consumption, the minimum period for charge would be two months
provided the Junior Engineer concerned has satisfied himself
that the transformer would not be overloaded beyond prescribed
limit.
b)
The fuel charge/ Variable cost adjustment charge shall
also be levied at 1.5 times the prevailing rate in addition for
the respective category.
c)
Connection and disconnection charges shall be paid separately.
d)
Advance-Estimated energy consumption charges are payable in
advance before serving the temporary connections subject to
replenishment from time to time and adjustment as per final
bill after disconnection.
TOP
5
Rounding off
All
bills will be rounded off to the nearest rupee.
6
Other Terms and Conditions
a)
This schedule is subject to the application of such
corresponding provisions as may be applicable as per the
relevant category Rate Schedule.
b)
No rebates/ concessions under any head would be applicable to
connections under this category.
c)
Late payment Surcharge: If the bills are not paid by the
consumers within the period (due date) prescribed, a surcharge
of 1.5% per month of the total amount of monthly bill (including
outstanding arrears) will be payable in addition.
d)
Fuel/ Variable Cost Adjustment (VCA) Charge: Fuel charge/ VCA
charge, if any, shall be levied in addition to energy
charge.
e)
Meter Hire – Meter Hire shall be charged as per the Schedule
of Miscellaneous Charges. Part of a month will be reckoned as
full month for purpose of billing.
f)
The billing demand shall be the demand requisitioned by the
consumer or the highest monthly maximum demand during the period
of supply commencing from the month of connection ending
with the billing month, whichever is higher
g)
The month for the purpose of temporary supply shall mean 30 days
from date of connection or for further part thereof.
h)
Any expenditure up to point of supply shall be paid
by the consumer as per prescribed procedure.
i)
Connection and Disconnection Charges shall be paid separately
j)
In case of any dispute on applicability of tariff on a
particular LT category , the decision of the Commission shall be
final and binding.
k)
The tariff does not include any tax or duty, etc. on
electrical energy that may be payable at any time in accordance
with any law then in force. Such charges, if any, shall be
payable by the consumer in addition to the tariff charges.
l)
Notwithstanding the provisions, if any, contrary to the
agreement entered into by the consumer with the Board, all
conditions prescribed herein shall be applicable to the
consumer.
PREVIOUS
|TOP | NEXT
|