Information on Tripping/Breakdown/Outage of Generating Units of MPPGCL |
|||||||
| S.No | Name of Generating Station | Unit No | Time & Date when unit trip/shutdown for Maintenance | Time & date of unit comes on Bar | Total duration of Outage of unit | Reason of Outage | Name & Designation of Message Sender |
| 1 | Gandhi Sagar Hydel Power Station | Unit No.3 | 11.00Hrs/ 16.01.2006 | 16.45 Hrs/ 16.01.2006 | 5.45 Hrs | Inspection/Maintenance of 132 KV SF-6 Breaker mechanism by M/s BHEL Expert | A.K. Tailor, S.E. (O&M), MPPGCL, Gandhisagar HPS vide fax dt.17.01.06 |
| 2 | Unit No 1. | 10.25 Hrs / 17.01.2006 | 11.50 Hrs / 17.01.2006 | 1.25 Hrs | |||
| 3 | Unit No 3. | 13.40 Hrs / 17.01.2005 | 15.10 Hrs. / 17.01.2006 | 1.30 Hrs | |||
| 4 | Unit No. 4 | 20.25 Hrs/ 19.01.06 | 17.25 Hrs/ 20.01.06 | 21.00 Hrs | Bulcholze and R&B phase differential relay operated | fax dt.20.01.06 | |
| 5 | Pench Hydel Power Station | 80 MW Unit No.2 | 11.13 Hrs./ 11.01.06 | 17.47 Hrs 15.02.2006 | 840.30 Hrs | Unit de-synchronized due to Generator Bottom guide bearing temp. high | D.K. Mishra, SE (O&M) PENCH vide fax dt. 17.02.06 |
| 6 | Gandhi Sagar Hydel Power Station | Unit No.2 | 06.15 Hrs./ 23.01.06 | 11.30 Hrs./ 23.01.06 | 05.15 Hrs. | 132 KV Breaker mechanism problem | A.K. Tailor, S.E. (O&M), vide fax dt.23.01.06 |
| 7 | Unit No.3 | 12.30 Hrs./ 23.01.06 | 17.50 Hrs. / 23.01.06 | 5.40 Hrs. | 132 KV SF-6 Breaker problem | ||
| 8 | SGTPS, Birsinghpur | Unit No.4 | 09.25 Hrs./ 24.01.06 | 2.15 Hrs 26.01.06 | 40 Hrs 50 Min. | Primary Super heater leakage | S.E. (OPN-I), SGTPS, vide fax dt.24.01.06 |
| 9 | Gandhi Sagar Hydel Power Station | Unit No. 1 | 5.50 Hrs / 27.01.06 | 10.05 Hrs / 27.01.06 | 04.15 Hrs. | 132 kV SF-6 Breaker mechanism maintenance work | A.K. Tailor, S.E. (O&M), MPPGCL, Gandhi Sagar HPS |
| 10 | Gandhi Sagar Hydel Power Station | Unit No. 3 | 11.40 Hrs./ 27.01.06 | 16.50 Hrs / 27.01.06 | 05.10 Hrs | 132 kV SF-6 Breaker mechanism maintenance work | A.K. Tailor, S.E. (O&M), MPPGCL, Gandhi Sagar HPS |
| 11 | Gandhi Sagar Hydel Power Station | Unit No. 3 | 10.20 Hrs./ 29.01.2006 | 14.35 Hrs./ 29.01.2006 | 04.15 Hrs. | 132 kV SF-6 Breaker mechanism maintenance work | B.R. Pancholi, SE (O&M), MPPGCL, Gandhisagar HPS |
| 12 | Unit No. 1 | 10.00 Hrs./ 30.01.2006 | 10.45 Hrs./ 29.01.2006 | 00.45 Hrs | 132 kV SF-6 Breaker mechanism maintenance work | ||
| 13 | ATPS Chachai | Unit No. II | 23.00 Hrs./ 01.02.2006 | 07.50 Hrs./ 04.02.06 | 56.50 Hrs | Tube leakage of Boiler No. 3 | S.E. (O&M), PH-I ATPS, CHACHAI |
| 14 | STPS Sarni | Unit No.2 | 10.47 Hrs./ 06.02.06 | Feed control valve problem and air heater tube chocking | D.K. Dubey, S.E. | ||
| 15 | SGTPS, Birsinghpur | Unit No.2 | 11.35 Hrs./ 07.02.2006 | 13.02 Hrs./ 07.02.2006 | 1.34 Hrs | Tripped on Drum level very low | S.E. (OPN-I), SGTPS, vide fax dt.07/02/06 |
| 16 | SGTPS, Birsinghpur | Unit No.4 | 09.57 Hrs 15.02.2006 | 07.00 Hrs. 17.02.06 | 45.03 Hrs | Boiler tube leakage | S.E. (OPN-II), SGTPS, vide fax dt.15/02/06 |
| 17 | SGTPS, Birsinghpur | Unit No.1 | 12.18 Hrs./ 16.02.2006 | 19.47 Hrs 20.02.2006 | 103.29 Hrs | To attend tube leakage | S.E. (OPN-I), SGTPS, vide fax dt.16/02/06 |
| 18 | Gandhi Sagar Hydel Power Station | Unit No. 3 | 19.43 Hrs./ 16.02.06 | 15.20 Hrs. / 17.02.06 | 20.17 Hrs | Unit tripped on stator earth fault. | B.R. Pancholi, S.E. (O&M), MPPGCL, Gandhi Sagar HPS |
| 19 | ATPS Chachai | Unit No. I | 23.22 Hrs./ 22.01.2006 | Boiler No.3. Tube Leakage | S.E. (O&M), PH-I ATPS, CHACHAI | ||
| 20 | ATPS Chachai | Unit No. II | 10.55 Hrs./ 19.02.2006 | 02.30 Hrs. 22.02.06 | 51.35 Hrs | For attending M.S. Line drain valve of T.G. Set | S.E. (O&M), PH-I ATPS, CHACHAI fax dt. 23.02.06 |
| 21 | Gandhi Sagar Hydel Power Station | Unit No. 3 | 09.45 Hrs./ 11.02.06 | 14.40 Hrs. / 11.02.06 | 02.00 Hrs. | Main cooling water valve attending work | A.K.S. Rathore, E.E. (EMD), MPPGCL, Gandhi Sagar HPS vide letter No 344 dt 11.02.06 |
| 22 | SGTPS, Birsinghpur | Unit No.2 | 16.25 Hrs./ 21.02.2006 | 17.57 Hrs./ 21.02.2006 | 1.32 Hrs | Condenser Pressure very high | S.E. (OPN-I), SGTPS, vide fax dt.22/02/06 |
| 23 | ATPS Chachai | Unit No. II | 12.33 Hrs./ 23.02.2006 | 22.05 Hrs./ 05.03.2006 | 249.32 Hrs | Tube leakage of Boiler No. 1 | S.E. (O&M), PH-I ATPS, CHACHAI fax dt. 24.02.06 |
| 24 | SGTPS, Birsinghpur | Unit No.2 | 22.05 Hrs./ 23.02.2006 | 21.12 Hrs./ 25.02.06 | 71.30 Hrs | To attend tube leakage | S.E. (OPN-I), SGTPS, vide fax dt.24/02/06 |
| 25 | SGTPS, Birsinghpur | Unit No.1 | 14.28 Hrs./ 27.02.2006 | 16.10 Hrs./ 27.02.06 | 1.42 Hrs | Low lub. oil pr. after filter | S.E. (OPN-I), SGTPS, vide fax dt.27/02/06 |
| 26 | Gandhi Sagar Hydel Power Station | Unit No. 2 | 18.12 Hrs./ 26.02.06 | 19.25 Hrs. / 26.02.06 | 01.13 Hrs. | 132 Kv MOCB mechanism checking work | B.R. Pancholi, S.E. (O&M), MPPGCL, Gandhi Sagar HPS vide letter No 476 dt 27.02.06 |
| 27 | ATPS Chachai | Unit No. I | 09.05 Hrs./ 01.03.2006 | 09.47 Hrs./ 01.03.2006 | 42 Minutes | Avr Problem | S.E. (O&M), PH-I ATPS, CHACHAI fax dt. 01.03.06 |
| 28 | STPS Sarni | Unit No.6 | 13.58 Hrs./ 03.03.06 | Feed control valve problem and air heater tube chocking | Shri R.K. Datey S.E. OPN PHI | ||
| 29 | Gandhi Sagar Hydel Power Station | Unit No. 3 | 10.15 Hrs./ 03.03.06 | 11.15 Hrs./ 03.03.2006 | 1.00 HRS | 11 KV XLPE cable termination kit indoor (1 NO. in R Phase) replacement work | S.E. (O&M) MPPGCL, Gandhi Sagar HPS vide letter No 548 dt 03.03.06 |
| 30 | STPS Sarni | Unit No.7 | 09.05 Hrs./ 11.03.06 | Generation Stator Earth fault | S.E. OPN PHII | ||
| 31 | STPS Sarni | Unit No.7 | 17.15 Hrs./ 20.03.06 | Tube leakage in boiler | Shri S.K. Shah S.E. OPN PHII | ||
| 32 | SGTPS, Birsinghpur | Unit No.4 | 11.00 Hrs./ 22.03.2006 | 12.44 Hrs./ 22.03.06 | 44 Min. | Tripped on furnace pressure very high falling of cinker suspected. | S.E. (OPN-II), SGTPS, vide fax dt.23/03/06 |
| 33 | SGTPS, Birsinghpur | Unit No.3 | 13.25 Hrs./ 22.03.2006 | Hand tripped at 13.25 hrs due to suspected tube leakage in primary super heater | S.E. (OPN-II), SGTPS, vide fax dt.23/03/06 | ||